Hi. I am having an issue with a ups systems grounging electrode conductor. It is a 20kv system with a maintenace bypass cabinet. The by pass cabinet needs a GEC. I believe I need a GEC for the UPS since it is a seperetly derived system. Do I need two seperate GEC that go back to the main service. I have one for the Bypass cabinet that the mfg required to be the same size as the ungrounded conductors. Can I tap off from one to the other with an apprved method?
Thanks Dave
Thanks Dave