I am installing a 208/120VAC Power Dist. Panel with a MAIN breaker inside and receiving 3 phase 208/120VAC Power Feed from a UPS. My question is, do I need to provide a "power junction box" so my customer can land their power cables so they wont have to open the panel? Also, I want to make sure there is no need for any additional over current protection disconnects upstream from the main breaker on the panel. Thank you