Most all new services around our area are underground, a 200 amp Meter main pedestal set by the power company next to the utility pole.
It has the meter and a 200 amp main breaker in it.
I've looked in several ditches before they covered it all up.
The Electricians are running 4/0 URD from the pedestal to the house 3 wire no ground.
All of these services are inspected and passed without the 4 wire installed to the dwelling.
Is there something that allows this that I dont know about?
I see it all over the place.
It has the meter and a 200 amp main breaker in it.
I've looked in several ditches before they covered it all up.
The Electricians are running 4/0 URD from the pedestal to the house 3 wire no ground.
All of these services are inspected and passed without the 4 wire installed to the dwelling.
Is there something that allows this that I dont know about?
I see it all over the place.