Hi,
I have 2 fire pumps duty/standby. instead of running 2 separate feeds from the power source can i run one and use a splitter box to split that into 2 feeds near the fire pump controllers? is there anything in NEC/NFPA stopping me from doing that?
The fire pumps are 575/3/60 and 200HP each.
The splitter size i will be using is 400A
Thanks