We are designing a city building, and I have a problem I would like to know an opinion:
We designed for a 600 amp generator feeding a 600 amp Main IN-Line panel, but later noticed there is not much room for future expansion or load. We then decided to increase the main service panel to 800 amp instead and the city accepted the cost difference to be added to the project. And here comes the problem, due to allocated fund there is no more money to increase the generator to 800 amp as happened to main service entrance panel. Since generator are smart enough to load shedding, we can control what loads are permitted and through relays turn off what exceed over 600 amp limit of the generator.
But what about the feeder from the generator to the main service entrance panel? should it be rate to the generator limits of 600 amp,or the panel 800 amp? Is this a code violation?
please see attachment.
Thank you all
We designed for a 600 amp generator feeding a 600 amp Main IN-Line panel, but later noticed there is not much room for future expansion or load. We then decided to increase the main service panel to 800 amp instead and the city accepted the cost difference to be added to the project. And here comes the problem, due to allocated fund there is no more money to increase the generator to 800 amp as happened to main service entrance panel. Since generator are smart enough to load shedding, we can control what loads are permitted and through relays turn off what exceed over 600 amp limit of the generator.
But what about the feeder from the generator to the main service entrance panel? should it be rate to the generator limits of 600 amp,or the panel 800 amp? Is this a code violation?
please see attachment.
Thank you all