In hospital project, we have generator room located 1000ft far from the served hospital. we need 30 sets of 4core300mm2 cables to achieve 2% voltage drop at the service disconnect in hospital. The optional solution rather than using this no of cables is using a busway which is smaller in size and lenght where we have two service disconnects located in two different locations. During my experience in hospital, i have never seen a busway used in emegency system even though the emegency panels aligned vertically. I know there is no code issue if using busway in emegency system. what you advise me to do since we may face installation problem if we go for cables.