What are the main properties I need to consider for a dual service---
(I know this is not something to try at home)-- but the owner wants
on-site "micro turbine(s)" to use for supplying about 1200 amps (with
future provisions for double this capacity)--
at 208/120-3-4W service into the electrical room in a proposed building.
References to printed resources would also be welcomed.
(I know this is not something to try at home)-- but the owner wants
on-site "micro turbine(s)" to use for supplying about 1200 amps (with
future provisions for double this capacity)--
at 208/120-3-4W service into the electrical room in a proposed building.
References to printed resources would also be welcomed.