Capital
Member
- Location
- morris plains nj
480v, 3000amp, service supplied from a vault on cable tray, from the tray out of the vault conduit is used and connected directly in the back of the switchgear. My question is, can the phase conductors be run separately through the conduit. ie: all the parallel condutors phase 1 in conduit #1, phase conductors phase 2 in conduit #2 and so on.