I have Genesis Shaftway Model consist of hoistway or shaftway model GLV 144. Its a enclosed vertical platform lift.
Following questions:
1. Would NEC 2014 Article 620.22 or 620.53 apply?
2. Would machine/control room or space be required? If yes then which code section.
3. Would NEC 2014 Article 620.71 apply?
4. Would NEC 2014 Article 620.24 apply?
5. Would the vertical lift motor disconnect be in machine/control room or space?
Following questions:
1. Would NEC 2014 Article 620.22 or 620.53 apply?
2. Would machine/control room or space be required? If yes then which code section.
3. Would NEC 2014 Article 620.71 apply?
4. Would NEC 2014 Article 620.24 apply?
5. Would the vertical lift motor disconnect be in machine/control room or space?