Hello,
I'm new to this, but in an electrical network, when do we decide that we need to check for voltage drop and do our calcs per the NEC code?
I'm following my senior engineer, but I don't understand when he decides to do those calcs for a specific path in a given electrical network.
Thank you
I'm new to this, but in an electrical network, when do we decide that we need to check for voltage drop and do our calcs per the NEC code?
I'm following my senior engineer, but I don't understand when he decides to do those calcs for a specific path in a given electrical network.
Thank you