I am designing a feeder from an empty MCC bucket to an internal 37.5kVA, 480V, 1 Phase transformer in a generator enclosure approximately 800' away. I want to verify if I need to follow the 3% or 5% voltage drop rule in NEC 215.2(A)(1)b IN 2? I am interpreting this as a feeder and branch circuit and can use the 5% for voltage drop...is this correct?