DonaldSparkyDog
Member
Blueprints designed a voltage drop for a 20 amp 240 volt branch circuit that requires a #2 XHHW, (long run). Submittals approved 2 pole 20 amp CB that only accepts #8 max wire size. EE says just splice the #8 to the #2 right below the panelboard and terminate to the CB. I am of the understanding that a circuit that is increased in size for voltage drop is to remain that size through out the circuit loop. Would not the #8 develop heating issues under load? Thanks.