Is a roll-around tool box always positioned in front of an industrial control panel considered storage? Is it OK because it can be rolled out of the way?
Clearly they forgot to take those two screws out before they installed the heater.... you can't remove the
panel cover screws to get the cover off.
i found this one last saturday on a trouble call to a strip mall store...
owner had me come out to check the AC, and i wanted to see if the
breaker was cooked in the sub panel.
tenant had replaced the hot water heater all by themselves.
they forgot the toolbox wheels on the bottom of the hot water
heater... 50 gallon one, covering the panel. you can't remove the
panel cover screws to get the cover off.
But they did put the seismic strap on it.
View attachment 9052
Is a roll-around tool box always positioned in front of an industrial control panel considered storage? Is it OK because it can be rolled out of the way?