Sierrasparky
Senior Member
- Location
- USA
- Occupation
- Electrician ,contractor
I was wondering if SE cable 2-2-2 no neutral just a bare ground was ever allowed as the feeder from the Milti- meter tennant MSB outside to the tennant load center 20 feet inside the idividual units.
I ran across a old apartment building that is wired this way. Never seen any done like this before. It's old and before my time.
Just wanted to know if it ever was legit?
Up to what code was it allowed?
I ran across a old apartment building that is wired this way. Never seen any done like this before. It's old and before my time.
Just wanted to know if it ever was legit?
Up to what code was it allowed?