I have a question on where to terminate my water and gas bonds. I have a 200 amp meter main combo for my external disconnect requirement. This feeds directly through the wall into my basement where my main service panel is. My question is, when running my gas and water bonds do I run them to my separated ground bar in my main service panel, or do I need to run them to my external disconnect? Thanks for the help.