i am currently remodeling my home. i upgraded my service from 125amps to 200amps. There was never any bonding. just the concrete encased uffer.
i am adding a water bond and a gas bond. i have read in article 250. but am not sure in the interpratation. i know that i need a #4 for the water and a #6 for the gas.
1st question. Can i loop the 2 bonds. i have been told that i can use #4 to do this. did not find it in the code
2nd question. how is "secure" interpretated in the code. my interpretation is that i need to strap it up every two feet. i left out that it is runnin on the outside. i have a spool of #4 THHN. what i have been suggested to do by a few people is to run the wire underground. will an inspecter pass that. i havnt been able to find any codes that say that i cant. just that #4 and up need to be secure
i am adding a water bond and a gas bond. i have read in article 250. but am not sure in the interpratation. i know that i need a #4 for the water and a #6 for the gas.
1st question. Can i loop the 2 bonds. i have been told that i can use #4 to do this. did not find it in the code
2nd question. how is "secure" interpretated in the code. my interpretation is that i need to strap it up every two feet. i left out that it is runnin on the outside. i have a spool of #4 THHN. what i have been suggested to do by a few people is to run the wire underground. will an inspecter pass that. i havnt been able to find any codes that say that i cant. just that #4 and up need to be secure