this is a remodel job for a 2 unit residential job. there is a 200amp 2 gang meter socket with no disconnects. it will have 2 100amp main panels next to eachother in the basement. the building only has 1 water meter to service both units. what is the proper way to run the ground wire from the water meter to the service equipment? do I make 2 separate runs and take one each from water meter to each main panel or run 1 conducter to 1 panel? can someone provide some guidance and references to back up the proper installation?
this is a remodel job for a 2 unit residential job. there is a 200amp 2 gang meter socket with no disconnects. it will have 2 100amp main panels next to eachother in the basement. the building only has 1 water meter to service both units. what is the proper way to run the ground wire from the water meter to the service equipment? do I make 2 separate runs and take one each from water meter to each main panel or run 1 conducter to 1 panel? can someone provide some guidance and references to back up the proper installation?