I recently looked at a job at a weld shop to add 2 50 amp 480 rec but outta space in mdp and 480 panel to save cost i suggested we tap into two of the six welder rec in gutter using correct size wire and approved splicing methods like ilscos since they only run three welders at a time they just need add rec to cut down on ext cords on floor we would label each rec to avoid trying to plug into two on same circuit but they were concerned about nec i cant find anywher that talks about this issue help would be great