I am working on a welding shelter and the clients need (4) 240V, 1ph, 50A receptacles for welding machine installed on the columns, since the shelter is an open canopy. I wonder what are the different installation options to install the receptacles. The receptacles will be circuited to one of the panelboards located in the adjacent building.
thanks!
thanks!