My neighbor has a 240 3 phase well pump connected to an edison meter and drop at the pole he wants me to connect his shed 120 single phase can it be done and is it legitamite
 
Are you wanting to feed the 3-ph motor with a 120v 1-ph from the shed, or are you wanting to take 120v from the 3-ph service for receptacles in the shed?
 
or are you wanting to take 120v from the 3-ph service for receptacles in the shed?

this is the way i read it. i'm still waiting on an answer to tom's question before giving any input. i would rather know that fullamp knows what he's looking at, rather than say, "well if you have this. . . .".


edit --- after some thought, i can now see why you asked your question 480. . . . .
 
Last edited:
A simple one-line sketch would be most appropriate to visually demonstrate exactly at what point you desire to tap the service. Hint: Lets hope it is after the meter and before the combination starter!
 