Commercial building single phase 120/240 . Looking to install 2 meters and 2 200 disconnect s. Looking at unipak meter board. What table would u use for service riser ampacity. For 2020.
So the code is saying u need a main disconnect for the meter pack. So two meters two 200 tenant disconnect and a main 200 or does it need to be article 220 for main