ss electric
Member
existing 100 amp panel / maxed out
addition 20 amp 240v condenser
60 amp 240v air handler/electric strip heat
new meter/panel combo
tie into existing panel
50 feet to cond.
70 feet to air handler
running pvc to hvac equipment
copper wire for service
other thoughts?
thanks for info
addition 20 amp 240v condenser
60 amp 240v air handler/electric strip heat
new meter/panel combo
tie into existing panel
50 feet to cond.
70 feet to air handler
running pvc to hvac equipment
copper wire for service
other thoughts?
thanks for info