jmargolis79
Member
- Location
- minneapolis
I have a 480 X 240/120 single phase 5KVA XFMR. This is all outside. Next to the XFMR is a small 120/240 panel. I bonded in the XFMR and then ran 2 hots,1 neutral,1 ground to the panel and removed the bonding screw. Another JW wanted to bond at the panel using the bonding screw. My thought was the earlier the better. What would you do?