Please see attached sketch. It shows underground water pipe grounding electrode (UWPGE), ground rods and two service discos grounding electrode tapped from each going to common grounding electrode in sketch labeled #1 and #2
I am trying to comply with 250.64(D)(1) and the supplemental electrode req when UWPGE is the only electrode at site however I am not sure where to connect or which one is correct.
#1 in sketch show gnd rods and common grounding electrode conductor tie to UWPGE and #2 in sketch show gnd rods tie to common grounding electrode conductor
Which one is compliance with NEC 2017 section 250?
I am trying to comply with 250.64(D)(1) and the supplemental electrode req when UWPGE is the only electrode at site however I am not sure where to connect or which one is correct.
#1 in sketch show gnd rods and common grounding electrode conductor tie to UWPGE and #2 in sketch show gnd rods tie to common grounding electrode conductor
Which one is compliance with NEC 2017 section 250?