The drip loop conductors spliced to the service enterance conductors,they land on the main breaker thats protecting the busbars.is the supply side before or after the main breaker?Thank you.
 

76nemo

Senior Member
Location
Ogdensburg, NY
If the POCO connects to the main breaker, how are you considered responsible for line side of it????? I have never heard of that. What in the hootanny am I missing here??????
 

George Stolz

Moderator
Staff member
Location
Windsor, CO NEC: 2017
Occupation
Service Manager
If the POCO connects to the main breaker, how are you considered responsible for line side of it????? I have never heard of that. What in the hootanny am I missing here??????
Huh? :confused:

zappy said:
The drip loop conductors spliced to the service enterance conductors,they land on the main breaker thats protecting the busbars.is the supply side before or after the main breaker?Thank you.
Why are you asking?
 

glene77is

Senior Member
Location
Memphis, TN
B 4
Bee Fore
Prior to the first disconnect

What kind of answer do we need?
Can we agree that it is, at least, after the drip loop?
Larry Fine can probably cite the NEC for this.
 