e57
Senior Member
- Location
- San Francisco, CA
I show up, afer so many changes in a HAVC guys plan to do a tiny mech room that even this chatches me by surprise. The HAVC guy changed locations of things soooo many times during rough that I knew even he was having trouble tracking it all. So when I showed to finish, I knew something would be tight in there. But this was something else. Anyway, the plumber apprently either was unaware, or refused after the 5~7th time to change, so his stuff is the only thing straight out of the walls.... However, I had to swap locations of my electrical to feed the furnaces - no biggy - but I figured I would add some insult to injury with this little unnecessary addition. Just for S&G.....
Look closely as you look at each picture....
Granted there is one whole funace yet still to be connected - yes - there is more being squashed into this space.....
Look closely as you look at each picture....
Granted there is one whole funace yet still to be connected - yes - there is more being squashed into this space.....