Working on a basic, single elevator project.
Vendor is telling me they don't size the Fused Disconnect switch protecting the elevator controller/elevator due to liability?
Would you agree with the above and it should be sized by the engineer?
I would think the vendor should size it.
Vendor is telling me they don't size the Fused Disconnect switch protecting the elevator controller/elevator due to liability?
Would you agree with the above and it should be sized by the engineer?
I would think the vendor should size it.