The generics
The generics
do not work for the whole country.
Here a back to back will be a 2.5" mast (required by POCO) Al 4/0 call the way. POCO will allow us to cut and reconnect service as long as inspection is done. A 100 amp back to back to a 200 amp back to back is roughly $3000 and a non back to back is the same with a $10 per foot for the 4 conductor SE and $300 for the disconnect or meter main
The generics
do not work for the whole country.
Here a back to back will be a 2.5" mast (required by POCO) Al 4/0 call the way. POCO will allow us to cut and reconnect service as long as inspection is done. A 100 amp back to back to a 200 amp back to back is roughly $3000 and a non back to back is the same with a $10 per foot for the 4 conductor SE and $300 for the disconnect or meter main