eljefetaco
Member
- Location
- Fanwood, NJ
I have little to no experience in solar. I am concerned with installing a automatic transfer switch on a house with solar. I would expect the solar to only work with utility power. Is that connection done at meter? Typically I install a service rated ats next to meter then feed former main and treat as a sub panel. What should I be concerned with?