JDB3
Senior Member
- Location
- San Antonio, Texas
Just went to a job site, others doing electric. The electrical contractors doing the house {EC#1}, bid the job with the service point on the house. Utility company would just go from their overhead lines to a "swing pole" on which the service was to be built, then ran underground to the house. Electricians doing the house, said that their bid did not include that & did not do that type of work. Hence, owner got another company {EC#2} to run underground to the house.
NOW the rub comes in! :rant:
EC#1 said that the whole system "had" to be bonded/grounded @ the service pole, 400 amp disconnect there.
EC#2 said system should be bonded/grounded @ the house, 2 200 amp panels on the house.
I was told that EC#2 ran 2 hots, 1 neutral, & 1 ground for each panel mounted on the house.
I have not looked it up yet, but am thinking that system should be bonded/grounded at both locations. I have not checked yet to see if there is a bond to the re-barb or about any ground rods yet.
What do you'll think :happyno: :happyyes:
NOW the rub comes in! :rant:
EC#1 said that the whole system "had" to be bonded/grounded @ the service pole, 400 amp disconnect there.
EC#2 said system should be bonded/grounded @ the house, 2 200 amp panels on the house.
I was told that EC#2 ran 2 hots, 1 neutral, & 1 ground for each panel mounted on the house.
I have not looked it up yet, but am thinking that system should be bonded/grounded at both locations. I have not checked yet to see if there is a bond to the re-barb or about any ground rods yet.
What do you'll think :happyno: :happyyes: