mjgilmore54
Member
Installing a 6 space 3R sub panel for pool equipment.Feeding sub panel from Main breaker panel useing a 70 amp 2 pole breaker. Installed 1 1/4 PVC conduit ,then ran dual rated thhn/thwwn conductors as follows: 2- # 4 for hot legs, 1- #6 for (neutral) grounded conductor and 1- #8 for equipment grounding conductor. Inspector left fail sticker that said " conductor size". Seems right to me .Any ideas?