I am Trying to wire 2 seperate holding bins each with a top rotary switch ( has 1 n.o. one n.c. contact) and each with a bottom rotary switch. Each bin has a seperate unload auger.( 480 v with 120v coil). When the grain dryer calls for corn i need one of the motors to start. once the bin has been emptied, i need the other bin to start every time the dryer calls for corn. It needs to empty this bin completly before switching back to first bin. The 2 bins will also be both empty at times so the latch relay can't fight itself. Does anyone have experience with this scenerio or have a econmical way of doing it?