Looked today at a 400 amp fused disconnect switch (lower right in photo) that was fed on it's line side by SEC's from utility network. The load side feeds a trough with one set of 600 kcmil conductors. In the trough is a tap to feed 2-200 amp meter enclosures which feeds 2-200 amp fused disconnect switches. The question is according to the NEC where is the service disconnect, before or after the meters?