will there be a second inspection?

Status
Not open for further replies.

zappy

Senior Member
Location
CA.
I passed my inspection.:) Inspector looked at the depth of the pipe, asked me where the homerun/runs where. Asked me about a ground wire missing. I told him I was using the rigid pipe as a grd. Asked about the gfci prtection, i showed him that. He mentioned that if I used 3/4" it would be a easier pull. I agreed. I asked him if he would like to see the lights I was putting in the ground. He said that wasn't nessisary. He was really cool. Signed the permit and left. So was that the rough in inspection, or was that the final? I would call, but there closed today. Thank you for your help.
 
Last edited:

zappy

Senior Member
Location
CA.
underground inspection

underground inspection

I believe. I guess i'll find out manana. Would it be on the permit he signed?
 