Yes, you will need to get the load info. From there you can size the wire and the overcurrent protective device. I assume the load is continuous -- if so then 125% should be added to the load fiven.
Yes, you will need to get the load info. From there you can size the wire and the overcurrent protective device. I assume the load is continuous -- if so then 125% should be added to the load fiven.