Was wondering what the best set up was for pulling about 100 ft of 4 #3/0 & 1 #6 in an existing 2 inch pvc with 4 sweeps, installing new 120/208 panel in TI
since 30 ft of the pvc is exposed in TI would it be wise to replace the sweeps with emt the rest of the run is under concrete to switch gear.
Kellem grip, lots of lube and rent a tugger was my plan??
TIA
since 30 ft of the pvc is exposed in TI would it be wise to replace the sweeps with emt the rest of the run is under concrete to switch gear.
Kellem grip, lots of lube and rent a tugger was my plan??
TIA