So I I'm currently installing a 1200A service switch to fee an Mdp with multiple breakers for a PV system
I'm using multiple 10x10 wire ways and fittings from the existing service switch to my new set up all wire way no conduit connectors lock nuts etc
My question is do I need to bond all these pieces together? or because their metalic and I'm using couplings and flanges all bolted together I should be good. See attached pics
Sent from my SM-S906U using Tapatalk
I'm using multiple 10x10 wire ways and fittings from the existing service switch to my new set up all wire way no conduit connectors lock nuts etc
My question is do I need to bond all these pieces together? or because their metalic and I'm using couplings and flanges all bolted together I should be good. See attached pics
Sent from my SM-S906U using Tapatalk