I am a small electrical contractor in a relativly small community. I have been asked to wire a small doctors office for an optomertrist.
Being that I do not do alot of commercial projects I am struggling with the correct method of wiring for this building. The building offical and plan review say that I can run romex throughout. I work with an elec engineer on a regular basis and he say's it falls under Article 517 Health Care Facility and that I should be using HCF wire for the redundant ground. I need some help any comments. The building is a wood frame construction.
Being that I do not do alot of commercial projects I am struggling with the correct method of wiring for this building. The building offical and plan review say that I can run romex throughout. I work with an elec engineer on a regular basis and he say's it falls under Article 517 Health Care Facility and that I should be using HCF wire for the redundant ground. I need some help any comments. The building is a wood frame construction.