Samardas
Member
- Location
- Los Angeles, CA, United States
- Occupation
- Electrical Engineer
Inspector is asking us to change the XP box with another box (maybe, 4X box?) with Motor Actuator Disconnect terminated with #10 wires. The total count of wires by the inspector is 10 (3 for incoming phases 1 for grounding + Device and the same for outgoing). I was looking up NEC Table 214.16(A) and (B) but it was not quite clear to me. I have attached a photograph of the wiring and the junction box. Please let me know if you need any more info. Your prompt response will be highly appreciated. Thanks a LOT!