Curious of your thoughts on this. (5) 20A circuits per pic going to same panel. Panel schedule says ¾” conduit but that’s boilerplate usually and could mean FMC which is conduit if they want to get cute and say it must be pipe.
Would you run a single run of tubing/pipe conduit to area of loads with the circuits or run MC cable from units to near panel? Panel is about 50' away. Thanks.