I have an existing 400a panel installed in a bathroom in a commercial building. There is a complete remodel of the area, the contractor removed and replaced all wiring in this double panel. Is there a chapter and verse that requires work done on an existing panel, that it must be brought up to current code requirements, as in moving the panel?