I've been reading over these forums and I have a question to ask ...
In England in my former job on a Steel mill I often had to work Hot in order to fault find. Bare in mind I am talking about an integrated steel mill ... from Coil to Tube was one process line. The Schematics for the mill were contained in Volumes A - J for the main mill with another 3+ Volumes for additional circuits added after the line was commissioned and a further 7 Program manuals for the PLC/PC hybrid system we used on control side. Faults were seldom apparent and the integration of the system made things worse. To fault find cold would take hours, possibly days on some faults.
Most of my hot work was on 24VDC/110VAC (Control side) and 415VAC-1000VAC operating side. (Never ever ever?under any circumstance even thought about *hot work* on incommers - they were 11,000VAC)
A fault in the system was 9/10 control side (Proximity/actuator/relay/PLC/etc) but it still meant alot of hot work on 415VAC+ circuits. Pure fault finding mind you with approved meters/rated insulated tools. Of course it still meant that anything upto 1000VAC was accessible (ie you could reach in and touch it if you were of a mind to do so)
The IEE regs (English Regs) are very strict on hot work in England, spotter's, certification for the Electrician etc etc?, so its not like we let apprentices run amuck in live panels ...
How does the US Regs view hot work? Strictly taboo? Or are there strict guidelines/precautions as in England?
Thanxs for info
Shaine.
In England in my former job on a Steel mill I often had to work Hot in order to fault find. Bare in mind I am talking about an integrated steel mill ... from Coil to Tube was one process line. The Schematics for the mill were contained in Volumes A - J for the main mill with another 3+ Volumes for additional circuits added after the line was commissioned and a further 7 Program manuals for the PLC/PC hybrid system we used on control side. Faults were seldom apparent and the integration of the system made things worse. To fault find cold would take hours, possibly days on some faults.
Most of my hot work was on 24VDC/110VAC (Control side) and 415VAC-1000VAC operating side. (Never ever ever?under any circumstance even thought about *hot work* on incommers - they were 11,000VAC)
A fault in the system was 9/10 control side (Proximity/actuator/relay/PLC/etc) but it still meant alot of hot work on 415VAC+ circuits. Pure fault finding mind you with approved meters/rated insulated tools. Of course it still meant that anything upto 1000VAC was accessible (ie you could reach in and touch it if you were of a mind to do so)
The IEE regs (English Regs) are very strict on hot work in England, spotter's, certification for the Electrician etc etc?, so its not like we let apprentices run amuck in live panels ...
How does the US Regs view hot work? Strictly taboo? Or are there strict guidelines/precautions as in England?
Thanxs for info