Recently our AHJ has taken up an in-house debate. The basic question is: Is the working space specified in 110.26 required at an unfused disconnect (example-AC pull out)? Some inspectors in our AHJ have made the argument that since it has no serviceable parts inside and any equipment on the load side of the disconnect would be opened for testing, the unfused switch does not require compliance with 110.26. What say you?????