I have an existing roof top AHU with heat pipes that run approx. 1' to 2' in front of the disconnect switch and service panel.
110-26A states that dimensions per table 110-26a must be met for servicing or maintenance while the equipment is energized.
If I de-energize the unit from its source, which is in the basement, is this in violation?
110-26A states that dimensions per table 110-26a must be met for servicing or maintenance while the equipment is energized.
If I de-energize the unit from its source, which is in the basement, is this in violation?