Never ran into this situation. I have a residential 120/240V flush mount panel located in a garage wall. Mechanical contractor needs to run a 1/2" black iron gas pipe adjacent to the panel to feed a second story range(only spot he can get through).Since the panel is flush mount as opposed to surface mount can the pipe be run if it falls within the 30" width working space? Had similar situations where the AHJ failed the final because piping was run after panel was set but that was surface mounted.Thanks.