The flexible cable and flexible conduit rules in Chapter 3 permit the use of listed cable ties identified for securement and support in a number of cases.
If your control wiring is covered by Article 725, there is no specific permission to use cable ties in the 2020 code. It appears that there will be in the 2023 code.