On a rewire job I'm doing..........
I'm about done and have mentioned to the owner that in the kitchen the frig and microwave should be on separate circuits.
Those appliances are currently on with the kitchen lighting and bath and garage and couple other things..........
He also relocated a large ac window unit (120v) to a different location.
These kitchen circs and ac where not in my contract.
He is getting the money from an organization for the electrical work. They signed off and I have just completed the job........
but this additional 3 appliances should be addressed.
I had sent a short letter to this organization mentioning of these 3 items... not getting deep into it. I just got off the phone with them,
I was being asked if these items were a safety issue, or was it for convenience, or was it code?
I was kinda able to answer that they could fall under all those headings....
So I was asked to write a proposal for these extra items and explain why they needed to be done.
I'm looking in the book.......one point may bring you to another and to another........you know...
Any suggestions how to get in and out of it real quick and not have to get into everything about it....
trying to find one sentence for each issue in an article if I can.
thanks..
Rich
I'm about done and have mentioned to the owner that in the kitchen the frig and microwave should be on separate circuits.
Those appliances are currently on with the kitchen lighting and bath and garage and couple other things..........
He also relocated a large ac window unit (120v) to a different location.
These kitchen circs and ac where not in my contract.
He is getting the money from an organization for the electrical work. They signed off and I have just completed the job........
but this additional 3 appliances should be addressed.
I had sent a short letter to this organization mentioning of these 3 items... not getting deep into it. I just got off the phone with them,
I was being asked if these items were a safety issue, or was it for convenience, or was it code?
I was kinda able to answer that they could fall under all those headings....
So I was asked to write a proposal for these extra items and explain why they needed to be done.
I'm looking in the book.......one point may bring you to another and to another........you know...
Any suggestions how to get in and out of it real quick and not have to get into everything about it....
trying to find one sentence for each issue in an article if I can.
thanks..
Rich
Last edited: