NY347Jersey
Member
- Location
- New York
For a New Yorkclient we are installing a new 3/C 350MCM feeder cable. The pull isprimarily underground through existing conduits but comes above ground viaa 4 foot sweeping elbow. From this elbow, we are pulling above ground intray to an outdoor switchgear unit. The client has raised concerns thatthe 90 coming from below ground to above ground is not per code and wouldintroduce snow, rain, and moisture into the conduit. Is a 90 coming aboveground against code? Also, what is the best method to weatherproof this area? I have not seen in code where this is a violation.