400 amp GEC

Status
Not open for further replies.

sid123456

Member
I looking at the prints for two descent sized department stores. The plans call for (3) 12ft., copper clad, 3/4" ground rods driven in a delta configuration twelve feet apart on center and joined by cadweld w/ 4/0 bare copper 18" below grade with handholes for inspection. Why so big for a 400 amp 3phase service?

The code is the minimum.
 