I did a job running power to a 75hp compressor. The company provided the spec FLA @ 178.5amps @240volts. I sized my pipe and wire accordingly. 2" EMT; 2/0 THHN cu, good for 195amps per NEC 310.16. I fused the bus plug and disconnect @ 200amps dual element time delay. Any guesses as to what happened?!